View Work Estimate

Estimation Type Original Estimation
Approved Estimation SR (P) Conservation of North West Minar and South west Minar from 2nd floor to Ground F loor Charminar Hyderabad Dist.(Hyderbad circle)
Plan/Non-Plan Ongoing S.R Work
Project Name SR (P) Conservation of North West Minar and South west Minar from 2nd floor to Ground F loor Charminar Hyderabad Dist.(Hyderbad circle)
Region South Region
Circle Hyderabad
Sub-Circle Charminar Sub Circle
Monument CHARMINAR, AT HYDERABAD
Financial Year 2017-2018
Sub Head Of the Work Minor Work
Rate Analysis By ASI
Report Summary This is an imposing structure marked by four tall minars, which give it, its name each raising to a height of 56 mts was completed in 1591-92 A.D (A.H.1000) by Mohammed Quli Qutub Shah, the fifth ruler of kutub Shahi dynasty of golconda and now situated in the ceneter of the hyderabad city in A.P. The magnificient monument constructed with materials like granite stone and lime mortar . The plastering and stucco work of ornamental cornices, corner arches and floral designs , graffities to be taken up as a major conservation work of this monument by ASI Hyderabad Circle. CLEANING and PLASTERING WORK The entire surface area to be throughly washed out with salt free water and emery papers atleast for 3 times and damaged plaster surface deplastered by hacking it with tools without disturbing its original mouldings in order to obtain a good key for plaster with wall surface , and the surface to be allowed to dry up for one week. In the case of Charminar monument in Hyderabad for stucco work we have to use lime mortar and for sibara coat(Final coat) with organic material like Joggery , Karakkai, and marble powder.
State
Head Plan
Funded By
Estimate Framed By Conservation Assistant , Charminar
Estimate Approved By Superintending Archaeological Engineer
Estimate Checked By Assistant Superintending Archaeological Engineer
Estimated Cost 3,933,000
Picture
Drawing
Inspection Performed By Superintending Archaeologist
Date of Visit 07-14-2016
Time 05:15
Inspection Summary
Inspection upload document
    Document not uploaded
Completion Report
    Document not uploaded
Estimated Start Date 01-10-2017
Estimated End Date 03-31-2017
Completion Approved by
Actual Labor Cost
Tendering Misc Charges
Total Expenditure
Approval Status Pending